Operation
Instruction
Of
Model DDZY217C -Z Single
Phase Smart Prepaid Electronic Meter
1.
General
The quotation for our IC card prepayment
meter is USD37/unit, FOB Hong Kong.
Model
DDZY217C -Z Single
phase smart prepaid electronic meter is designed and manufactured by adopting
the advanced ultralow power consumption solid integrated technology and surface
mounting technology(SMT) techniques, and it is used for measuring the active
energy in the Alternating Current single phase electric grip with rated
frequency of 50Hz.
It
adopts the hard-hitting special integrated circuit of energy meter, nonvolatile
memory and LCD display, etc.. It can realize the following functions:
A.
Measuring
of active energy in singe phase circuit
B.
Collection
of data via RS485
C.
Collection
of data via Infrared Communication
D.
Presetting
E.
Billing
of meter
F.
Etc.
It
meets the communication protocol of DL/T-645-2007: Communication Protocol for
Multifunction Meter.
It
adopts the anti-interference measures of multi-software and hardware to
guarantee that the meter can operate reliably, and the relevant departments of
power authorities can conveniently carry out the business operation of
automated management.
It
is the present best choice for realizing the measuring of single tariff energy
for civil and commercial purpose in China .
2.
Specification
2.1 Specification
|
Accuracy Class
|
Voltage
(V)
|
Current
(A)
|
Pulse Constant
|
||
|
Active
|
Active
|
|||||
|
DDZY
|
2.0
|
220
|
1.5(6) 5(20)
5(30) 5(40)
5(60) 10(40)
10(60)10(80)
20(80) 20(100)
|
Calculated
as per the
specification
of current
|
2.2 Outlines dimension:
3.
Main
Technical Index
3.1 Basic errors
|
Load Current
|
Power Factor
|
Limits of Error(%)
|
|
Class of meter: 2.0
|
||
|
0.05Ib≤I<0.1Ib
|
1.0
|
±1.5
|
|
0.1Ib≤I≤Imax
|
±1.0
|
|
|
0.1Ib≤I<0.2Ib
|
|
±1.5
|
|
0.2Ib≤I≤Imax
|
±1.0
|
3.2 Power consumption
As for voltage
circuit:
At
reference voltage, reference temperature and reference frequency, under no
communication condition, the active power and apparent power consumption in the
voltage circuit of meter will not be more than 1.5W and 10VA, and under the
communication condition, the active power and apparent power consumption will
not be more than 3W and 12VA.
As for current circuit:
At
basic current, reference temperature and reference frequency, the apparent
power consumption in the current circuit of meter will not be more than 1VA.
Operating
life: >10 years.
4.
Working
principle
It
adopts the special single phase multifunction metering chip to realize the
accurate measuring of active energy in single phase alternating current
circuit, and let the microprocessor read and collect the energy and store the
energy into the nonvolatile memory. It can realize the billing and controlling
of meter via RS485, infrared communication and CPU electric card. The inside
nonvolatile memory adopts the ferroelectric memory to guarantee the consumed
energy data can be kept more than 10 years after the system is power outage.
The
working principle diagram is as follows:
|
Working Power
Supply
|
|
Energy Measuring
|
|
Memory
|
|
Infrared
Communication
|
|
485 Communication
|
|
CPU Card Communication
|
|
Micro-
processor
|
|
LCD Display
|
5. Direction for use
5.1
Indicator lamp
A.
Pulse indicator lamp: The red pulse indicator lamp will flash one time when the
meter measures each pulse of active energy.
B.
Alarm indicator lamp: The red alarm indicator lamp will light continuously when
the meter alarms.
C.
Tripping indicator lamp: The yellow tripping indicator lamp will light when the
load switch of meter breaks.
5.2
Display of data
A. Awaking by pressing the button;
B.
Awaking by inserting the electric card
A. Automatic circular display
B.
Circular display by pressing the button
5.2.5 When the following conditions are happened, the LCD display will show the relevant code or the meter will alarm to hint, and the back light of LCD will light continuously and the LCD display of meter will show the following relevant information:
|
Error Information
Code
|
Error Information
|
|||
|
1
|
Err01
|
Error of
Controlling Return Circuit
|
|||
|
2
|
Err02
|
Error of ESAM
|
|||
|
3
|
Err10
|
Error of
Identification
|
|||
|
4
|
Err16
|
Error of Modifying
Secret Key
|
5.3
Automatic circular display and display by pressing the button
The
meter is with the automatic circular display and display by pressing the
button, and it can carry out the circular display and the display by pressing
the button as per the requirements of customers.
6.
Basic function
6.1
Freezing function
A.
Timing freezing: It can freeze the appointed energy data according to the
appointed time and time interval. Each timing freezing energy data will be kept at least 12 times.
B.
Instantaneous freezing: At the abnormal condition, it can freeze the present
calendar, time, all the energy data and important measuring data, and store the
last three times’ data.
C.
Daily freezing: It can store the energy data at zero o’clock per day and store
the data of last 62 days.
6.2
Measuring function
A.
Measuring unit: kWh for active energy
B. Measuring capability: 999999.99kWh
B. Measuring capability: 999999.99kWh
C.
It can measure the positive active energy, negative active energy, combination
active energy and store the energy data into the nonvolatile memory.
D.
It can store the total energy of last 12 times’ billing days and the single
tariff energy. The dividing line time of data store is at 24:00 o’clock on the
end of the each month, or at the integral point of the day from 1 to 28 of
every month.
6.3
Event log
A.
It can permanently record the energy information of energy-reset event.
B.
It can record the total times of programming and time of calibration, the time
of programming and time of calibration of last ten times, the code of operator
and the data code of programming items.
6.4
Function for controlling the charges.
A. It adopts the local method to realize the function of controlling the charges via CPU card.
A. It adopts the local method to realize the function of controlling the charges via CPU card.
B.
When the residual charges is less than the presetting alarming charges, the
meter will remind the users. The overdraft charges can be recorded timely. When
the overdraft charges is less than the presetting overdraft threshold charges,
the meter will generate the power off signal to control the load switch to cut
off the power supply. When the residual charges are more than the presetting
charges, the meter can be under the allowable non-tripping condition via the
remote or local method, and then the restoration of power supply can be done
manually by the users.
C.
Prepaid charges will superpose accurately into the residual charges inside the
meter, and at the same time, the relevant information, such as the residual
charges, the consumed energy parameters of meters and so on, will be written
into the CPU card.
7.
Outlines Dimension Diagram and Wiring Diagram
7.1
Wiring Diagram
Meter
with external switch Meter with
external switch Meter with built-in
Switch
7.2
Outlines Dimension Diagram
8.
Installation
8.1 The meters shall be qualified and sealed after
examination before they leave the manufactory.
8.2
The meter will be installed within the meter box for using. The mounting bottom
board for the meter shall be fixed to a solid, fireproof wall. The meter is
recommended to be installed in a height about 1.8 meters above sea level. In
the air there does not exist corrosive gas which could damage the meter.
8.3
The meter should be wired as per the wiring diagram shown on the terminal block
cover. It is better to use the copper wire or copper joint for connection.
9. Transportation and Storage
7.1
The meters shall not be shocked during the transportation and unpacking.
7.2
The meter stored should be with the original packing box, and the ambient
temperature shall be 0 ~400C .
The relative humidity shall not exceed 85%, in the atmosphere there does not
exist substance that could corrode the meter.
7.3 The
meter shall be placed on the rack and stack one on top of another for the
purpose of storage in the warehouse. But the height of stacked cardboard boxes
shall not exceed 5 layers. The stacked height of the storage of meters only
with inside packing box shall not exceed 5 Pcs.
10. Warranted period
The
users shall follow the operation instructions. If the meter is found not to
meet the requirements mentioned by us within 18 months from the day that the
meter left the manufactory and meter is not sealed off, the manufacturer shall
repair or replace it free of charge.
Distributors wanted...
ReplyDelete